Run Chart

Median run chart with four runs tests

Run Chart

A run chart shows a data series in time order and tests whether that order looks random. Unlike a control chart it has no control limits — only a median line. Four formal runs tests detect typical non-random patterns.

Median line: The median of the values. With random variation about half the points fall above, half below. Points exactly on the median count as below in the tests (as in Minitab).

Run about the median: A consecutive sequence of points all on the same side of the median. For purely random data the expected number of such runs follows from the counts above/below.

Run up/down: A sequence of consecutively increasing or decreasing values. Random series typically produce many short changes — extremely few (long monotone streaks) or extremely many (zigzag) are suspicious.

Run charts are used in the Measure phase to get a first feel for the process before setting up a control chart. They are less formal than Shewhart charts because they need no spread assumption — the median works for non-normal data too.

The Four Runs Tests

  • Clustering — too few runs about the median (points cluster on one side). Indicates a level shift or mixed population.
  • Mixtures — too many runs about the median (points cross too often). Indicates two superimposed sources, e.g. two machines.
  • Trends — too few runs up/down (long monotone runs). Indicates drift, wear, warm-up/cool-down effects.
  • Oscillation — too many runs up/down (zigzag). Indicates systematic over-correction, e.g. controller overshoot.

Each test produces a p-value. If p < α (default 0.05), the pattern is significant — the hypothesis of pure random order is rejected. More than one simultaneously-flagged test usually points to a real special cause.

Reading and Reacting

  • First inspect the shape — trends, cycles, jumps are often visible by eye.
  • Then check the p-values. A single small p can be chance (multiple comparisons!), two or more clearly indicate structure.
  • If patterns are significant: investigate the cause before setting up a control chart. Special causes will bias the baseline.
  • If all tests pass and the picture looks random: data is ready for a control chart (I-MR, X̄-R, …).

Pitfalls

Run chart as a control chart substitute: A run chart shows patterns but no control limits. It does not replace a control chart for ongoing monitoring — only the pre-analysis.

Unclear data order: Runs tests assume the order of values matches the time of collection. Sorted or regrouped data produces garbage results.

Too few data points: With fewer than ~10 points the runs tests carry almost no power. At least 15–25 points for meaningful p-values; on small samples interpret roughly.

Multiple comparisons: Four simultaneous tests inflate the false-alarm rate. A single p < 0.05 is weak evidence; the picture becomes significant when several tests fire at once or one is very small.

Examples

This module ships with the following example datasets — load any of them in the app with a single click.