Examples — overview

All example datasets and project templates that ship with Qprovement. Every entry opens directly in the matching module via deeplink.

175 examples across 69 modules

Define

5 Why: Delivery Time > 30 min
5-Why chain from symptom 'pizza arrives late' down to root cause 'order system without logistics function'.
Project template Module: 5-Why Analysis
DMAIC Project Plan Pizza Delivery
32 events across 7 weeks — from kickoff to project closure, with a gate review per phase. Dates are remapped to the current week (Monday anchor) on load so the plan always centers on today.
Project template Module: Calendar
Kano: delivery service
Six customer needs of a delivery service, rated by three customers using Kano — including the importance question and one tie.
Project template Module: Kano Model
Paper Helicopter — 5 Whys (Flight-Time Variation)
5-Why chain from "times vary between 1.5 and 2.3 s under identical configuration" down to the root cause "throwing technique not standardized".
Project template Module: 5-Why Analysis
Paper Helicopter — Charter
Charter for "Paper Helicopter from the trade-show booth — maximizing flight time with a single prototype". In scope: rotor length and paperclips. Out of scope: rotor width (irreversible, only 1 prototype), throwing technique, paper type, drop height. Target Y: mean flight time ≥ 3.0 s at σ ≤ 0.15 s.
Project template Module: Project Charter
Paper Helicopter — Follow-ups (todo list)
5 follow-up tasks after project close: a workflow note on activating the optimum panel in response-optimization, a second flyer for the wing-width augmentation, drop-height variation for robustness, documenting a throw SOP, and building a throwing fixture.
Project template Module: Todo
Paper Helicopter — Kano
Kano classification of three helicopter characteristics: must-be "flies at all", performance "flight time", attractive "autorotation (elegant spin, soft landing)". Ships its own VoC/CTQ tree instance (identical to the "Paper Helicopter — VoC/CTQ" example).
Project template Module: Kano Model
Paper Helicopter — SIPOC
SIPOC of the helicopter process: from the raw flyer through cutting, folding, clipping and dropping to the 18-run log table. Highlights the physically forced "trim rotor (between blocks)" step that motivates the later DoE blocking.
Project template Module: SIPOC
Paper Helicopter — Stakeholder Analysis
Stakeholder matrix with Qprovement Marketing (power high, interest high), trade-show visitor (power medium, interest high), flight instructor as SME (power low, interest medium), and paper supplier (power low, interest low).
Project template Module: Stakeholder Analysis
Paper Helicopter — VoC/CTQ
VoC "should fly long and glide down gently" translated into three CTQs: flight time ≥ 3.0 s, spread σ ≤ 0.15 s, and autorotation (qualitative). Forms the tree basis for the linked Kano example.
Project template Module: VoC → CTx Tree
Pizza Delivery (SIPOC)
Suppliers, Inputs, Process, Outputs, Customers for the Bella Margherita delivery process — 8 process steps from order intake to handover.
Project template Module: SIPOC
Pizza Delivery Project Plan (todo list)
15 tasks for the pizza delivery project across the DMAIC cycle — from kickoff and SIPOC through Ishikawa and hypothesis test to the reaction plan and lessons learned. Status, owner and target dates spread realistically: three done, three in progress, eight open, one blocked (waiting on a sponsor decision). Items with the calendar flag enabled appear in the DMAIC calendar as soon as that module is added to the Define tile.
Project template Module: Todo
Pizza Delivery Time (Project Charter)
Teaching case 'Bella Margherita': delivery times too long, cold-pizza complaints rising. Pre-filled with problem statement, three measurable goals, and the project-team org chart.
Project template Module: Project Charter
Questionnaire: software support
Customer survey on software support with a customer-group question, a section shown only to industry customers, a rating matrix, a Kano question and a free text — three questionnaires sent and six responses imported, ready for the group comparison and the Kano hand-over.
Project template Module: Survey builder
RACI Pizza Delivery
RACI matrix for 8 activities × 6 roles — who is R(esponsible), A(ccountable), C(onsulted), I(nformed)?
Project template Module: RACI Matrix
Stakeholder Analysis Pizza Project
7 stakeholders from CEO to accounting with power/interest ratings and support attitude (supporter / neutral / critic).
Project template Module: Stakeholder Analysis
VoC → CTQ Pizza Delivery
3 Voice-of-Customer quotes (cold pizza, long delivery, address issues) translated into CTQs with measurable requirements.
Project template Module: VoC → CTx Tree

Measure

Bimodal Process
Mixture of two normal distributions around 9.93 and 10.07 mm. Violates the normality assumption of Cpk.
Dataset Module: Process Capability
Bolt Diameter (capable)
100 normally distributed measurements around μ ≈ 10.00 mm with σ ≈ 0.05 mm. Textbook capable-process example.
Dataset Module: Process Capability
Gage run chart: attribute study
13 parts × 3 appraisers × 2 trials, binary result (pass/fail). Every rating agrees — except appraiser D, who rates part 20 differently on the second trial.
Project template Module: Gage Run Chart
MSA Type 1: capable gage
25 repeated measurements of a 10.0 mm reference part (LSL 9.9 / USL 10.1, T = 0.2 mm). Very small spread, negligible bias → Cg ≈ 2.56 and Cgk ≈ 2.51 well above the 1.33 threshold. Textbook capable-gage case.
Project template Module: MSA Type 1 (Cg/Cgk)
MSA Type 1: incapable gage
25 repeated measurements with large spread and noticeable bias. Cg ≈ 0.40 and Cgk ≈ 0.17 — gage clearly fails the capability threshold. Textbook case for a measurement system that must be rejected.
Project template Module: MSA Type 1 (Cg/Cgk)
MSA Type 1: marginal gage
25 repeated measurements with moderate spread and slight positive bias. Cg ≈ 1.01 sits just above the 1.0 threshold, but Cgk ≈ 0.68 falls well below it — bias pulls capability into the not-capable range (overall verdict: not capable). Shows why Cgk must be checked alongside Cg.
Project template Module: MSA Type 1 (Cg/Cgk)
MSA Type 2: acceptable Gage R&R
Crossed ANOVA study: 10 parts × 3 operators × 3 replicates (90 measurements). Small repeatability and reproducibility variation, dominant part variance → %GRR ≈ 5 % of study variation, ≈ 4 % of tolerance (6–14). Textbook acceptable measurement system.
Project template Module: MSA Type 2/3 (Gage R&R)
MSA Type 2: problematic Gage R&R
Crossed ANOVA study with large repeatability and reproducibility variation versus small part variance. 10 parts × 3 operators × 3 replicates → %GRR ≈ 79 % of study variation, ≈ 35 % of tolerance (7–13). Textbook case where the measurement system masks part-to-part variation.
Project template Module: MSA Type 2/3 (Gage R&R)
MSA Type 3: automated measurement system (no operator)
One-way random-effects ANOVA study without operator influence (25 parts × 2 replicates, Bosch convention). Automated CMM measures shaft diameter, within-part variation ≈ 1.5 µm vs. part-to-part variation ≈ 22 µm → %GRR ≈ 8 % of study variation, ≈ 9 % of tolerance, ndc = 16. Textbook acceptable automated measurement system.
Project template Module: MSA Type 2/3 (Gage R&R)
MSA Type 4: bias drift across the range (red)
Five references (2/4/6/8/10) with 10 repeats each; bias grows from 0 (ref 2) to +1.6 (ref 10). Clear linearity error — %Linearity ≈ 13 %, Q_MS,BI ≈ 27 %, slope highly significant. Both AIAG and VDA 5 turn red. Textbook case for rejecting a measurement system.
Project template Module: MSA Type 4 (linearity)
MSA Type 4: linear gage (green)
Five references (2/4/6/8/10) spanning the measurement range (LSL 0 / USL 12, T = 12) with 10 repeats each. Negligible bias and no slope — %Linearity ≈ 0.07 %, Q_MS,BI ≈ 0.15 %. Textbook linear-gage case across the full range.
Project template Module: MSA Type 4 (linearity)
MSA Type 5: binary, good gage (green)
3 appraisers × 30 parts × 3 replicates (binary OK/NOK). Fleiss κ ≈ 0.92, effectiveness ≈ 97.8 % per appraiser. Textbook acceptable attribute gage.
Project template Module: MSA Type 5 (attribute)
MSA Type 5: binary, marginal κ, miss rate too high (red)
3 appraisers × 30 parts × 3 replicates (binary OK/NOK). Fleiss κ ≈ 0.58 and effectiveness 83–88 % alone would be marginal; under AIAG the miss rate (up to 24 %) and false-alarm rate (up to 23 %) decide — the gage is not acceptable. Five parts with unbalanced replicates; removing the reference column triggers ambiguous consensus (W_AMBIGUOUS_CONSENSUS).
Project template Module: MSA Type 5 (attribute)
MSA Type 5: binary, wide data layout (appraiser × trial as columns)
The same data as “binary, good gage”, but one column per appraiser and trial (A-1 … C-3), as in Minitab’s “multiple columns”. 3 appraisers × 30 parts × 3 trials — same figures as in the long layout.
Project template Module: MSA Type 5 (attribute)
MSA Type 5: counting test (training)
3 appraisers × 20 templates × 2 replicates (binary OK/NOK). The classic counting exercise from training: Fleiss κ ≈ 0.79, effectiveness 85–90 %; the AIAG verdict is red because the miss rate (25 %) and false-alarm rate (17 %) are too high. Contains all three teaching cases — an over-strict appraiser, an appraiser who contradicts himself, and one template where everyone agrees and everyone is wrong.
Project template Module: MSA Type 5 (attribute)
MSA Type 5: nominal, three defect classes (green)
3 appraisers × 25 parts × 2 replicates (nominal A/B/C). Fleiss κ ≈ 0.84, effectiveness 94–96 % per appraiser. Illustrates pairwise Cohen κ, Fleiss κ and confusion heatmaps for unordered categories.
Project template Module: MSA Type 5 (attribute)
MSA Type 5: ordinal, scale 1–5 (green)
3 appraisers × 20 parts × 2 replicates (ordinal 1–5). Fleiss κ ≈ 0.77, weighted Cohen κ (quadratic) ≈ 0.95 per pair, effectiveness ≈ 90 % per appraiser. Occasional neighbour ratings (±1) — module reports weighted κ as the leading KPI.
Project template Module: MSA Type 5 (attribute)
MSA Type 6: I-MR, drifting process (red)
50 individual measurements with a linear trend (+0.02 per point). The drift test fires highly significant (p ≈ 0.00009) — the gage or process drifts over time.
Project template Module: MSA Type 6 (stability)
MSA Type 6: I-MR, stable process (green)
50 individual measurements without subgroups. Control chart and drift test unremarkable (p ≈ 0.84) — textbook case of a stable process with no special causes.
Project template Module: MSA Type 6 (stability)
MSA Type 6: x̄-R, mean shift (red)
25 subgroups of n = 5, baseline limits from only the first 15 subgroups. From subgroup 16 onward the mean shifts by +1.2·σ_x̄ — Nelson rules 5/6 fire, verdict “unstable” (driver: Nelson). Warns because the baseline has fewer than 20 subgroups.
Project template Module: MSA Type 6 (stability)
MSA Type 6: x̄-R, stable process (green)
25 subgroups of n = 5. X̄ chart and R chart unremarkable, drift test not significant (p ≈ 0.41) — textbook case of a stable subgrouped process.
Project template Module: MSA Type 6 (stability)
Paper Helicopter — MSA Type 1 (Stopwatch)
25 repeated stopwatch readings against a metronome reference (60 bpm, target value 2.000 s) — Cg ≈ 1.35 / Cgk ≈ 1.15: capable, but borderline. Teaching point: check the clock before running the DoE.
Project template Module: MSA Type 1 (Cg/Cgk)
Paper Helicopter — Process Map
8 process steps from cutting to block change, including exact fold dimensions (rotor 80×47 mm, body 130 mm, fold lines x = 30/47/63 mm) and a rework loop back to the folding step on a fold defect.
Project template Module: Process Map
Process Map Pizza Delivery
8 process steps with value-type classification (VA / BNVA) and input types (parameter x / noise n). Order → kitchen → bake → pack → deliver → handover.
Project template Module: Process Map
Shifted Process
Mean off-center (μ ≈ 10.08 mm) → low Cpk despite small dispersion.
Generator Module: Process Capability

Analyze

Activity Flowchart Quote Request
7 steps from capturing a customer inquiry to the order confirmation — 6 activities plus one approval decision whose no-branch opens its own band with a revision step before looping back into the quote calculation.
Project template Module: Activity Flowchart
Bolt diameter with outliers (Grubbs)
30 bolt diameters from N(10.000, 0.050) with two seeded outliers at 9.745 and 10.260 (≈ ±5σ). Grubbs (two-sided), generalized ESD and Tukey IQR should flag both.
Project template Module: Outlier Test
Bolt diameter: Ppk with a bootstrap interval
30 bolt diameters from the Grubbs sheet (including its seeded outliers), tolerance 9.7–10.3 mm. The bootstrap gives a BCa interval for Ppk; a lower bound above the target 1.33 indicates capability.
Project template Module: Resampling
C&E Matrix Pizza Delivery
Inputs (routing, oven, traffic, …) versus outputs (delivery time, temperature, complaint rate) — weighted 0–9 ratings of the dependencies.
Project template Module: C&E Matrix
Compare means of two machines (2-sample)
Compare cycle time of two machines: difference Δ = 0.5 min at σ ≈ 0.8 min. Two-sided t-test, α = 0.05, power = 80 %. Cohen's d ≈ 0.63 — returns the n per group.
Project template Module: Sample Size
Compare variances of two suppliers (2-sample)
Compare scatter of two suppliers: suspected doubled variance (σ²₁/σ²₂ = 2.0). Two-sided F-test, α = 0.05, power = 80 %. Returns the sample size per group.
Project template Module: Sample Size
Complaint rate against a target (1 proportion)
18 of 200 shipments were complained about; the target is 5 %. Shows the test of one proportion against a target value (exact test, p = 0.024). Invented scenario.
Project template Module: Attribute Tests
Complaints by branch (5-sample ANOVA, unbalanced)
Complaints per day across five branches A–E, sample sizes 8/10/12/15/9. Branch D has a clearly elevated mean (6.2 vs. ~5.0) — post-hoc comparisons separate D from the rest.
Project template Module: Hypothesis Test
Delivery time by driver (k samples, permutation)
Three drivers with 15 delivery times each. Global permutation test of the means, a bootstrap interval per driver and pairwise comparisons with Holm correction — the distribution-free counterpart of the ANOVA example.
Project template Module: Resampling
Delivery time by driver (k-sample ANOVA)
Delivery times (min) for three drivers A/B/C, 15 each. True means 22/25/28 min at σ ≈ 3 — Cohen's f ≈ 0.82, strong ANOVA signal.
Project template Module: Hypothesis Test
Delivery time driver A vs. B (median, permutation test)
15 delivery times each for two drivers. Bootstrap interval for the difference of medians and a two-sided permutation test — no normality assumption.
Project template Module: Resampling
Deployment Flowchart Order Flow
5 steps from order to goods receipt across three lanes — customer, sales, and production — with four hand-offs made visible as lane switches.
Project template Module: Deployment Flowchart
Detect variance reduction (1-sample)
After a process improvement, scatter should have dropped from σ₀ = 1.5 to σ₁ = 1.0. One-sided chi-square test, α = 0.05, power = 80 %. Returns the n needed to confirm the improvement statistically.
Project template Module: Sample Size
Fill weight against target (one-sample t-test)
25 fill weights (g) from a filling line, normally distributed, tested against the 50 g target; the mean is 50.01 g. Goal: one-sample t-test with normality check, result not significant (p ≈ 0.96).
Project template Module: Hypothesis Test
Fit exponential waiting times
80 waiting times from Exponential(μ=15 min) — memoryless distribution. Exponential and gamma rank highest.
Project template Module: Distribution Fit
Fit lognormal cycle times
80 cycle times from Lognormal(μ_log=ln 5, σ_log=0.6) — strongly right-skewed. Distribution-fit should rank lognormal first.
Project template Module: Distribution Fit
Fit normal distribution
80 values from N(μ=10, σ=2) — clean textbook normal distribution. Shapiro-Wilk / Anderson-Darling should not reject H₀.
Project template Module: Distribution Fit
Fit Weibull lifetimes
80 component lifetimes from Weibull(k=2.5, λ=100 h). Classic wear-out case (β > 1); Weibull should rank as best fit.
Project template Module: Distribution Fit
FMEA Pizza Delivery
5 risks along the delivery process (address entry, oven overload, thermal packaging, traffic, allergen labelling) with S/O/D ratings, prevention and detection controls and special characteristics (CC/SC); the first four with 2 dated actions each (one already completed, one planned), the allergen risk as AP H without action, with a justification — burndown shows plan and actual lines.
Project template Module: FMEA
Inspection result by shift (chi-square)
240 inspection results (pass/fail) from three shifts; the night shift has more failures. Invented scenario.
Project template Module: Attribute Tests
Internal sales order processing
8 steps across 5 roles (customer, sales, dispatch, warehouse, accounting). Processing ≈ 53 min, waiting time dominates with ca. 2 d 13 h 30 min — PCE below 3 %. Showcases standard issues: inbox idle time, handover waiting, customer-side delays.
Project template Module: Makigami Matrix
Ishikawa: Delivery Time Too Long
Full 6-M example: 6 hypotheses across Man, Method, Machine, Material, Environment, Measurement — rated by three experts — plus 7 supporting facts and 6 experiments (with status, schedule, cost, linked to hypotheses).
Project template Module: Ishikawa 6M
Mean shift from target (1-sample)
Check whether the process mean drifts by Δ = 0.3 from target (σ ≈ 0.5). Two-sided t-test, α = 0.05, power = 80 %. Cohen's d = 0.6 (medium effect).
Project template Module: Sample Size
Multi-vari: filling line, crossed
2 machines × 2 shifts × 2 batches, unequally occupied with one missing combination. Crossed with REML — also shows how the module flags an unbalanced design.
Project template Module: Multi-Vari Chart
Multi-vari: injection moulding, nested
2 shifts × 2 mould cavities × 3 parts, 2 wall-thickness measurements each. Balanced and nested: most of the variation sits between the cavities, not between the shifts.
Project template Module: Multi-Vari Chart
Multi-vari: presses, display limit
3 shifts × 13 presses × 2 fill-weight measurements. With 13 presses as the second factor the design exceeds the limit of 12 series levels: the module does not draw the chart and names the “Presse” column instead. Learning goal: recognise the display limit; with the press set as the first factor the chart is drawn.
Project template Module: Multi-Vari Chart
Opportunity Flowchart Quotation Process
5 steps from the customer inquiry to the sent quotation — 3 value-added steps on the left, 2 rework steps on the right (chasing missing details, correcting the calculation).
Project template Module: Opportunity Flowchart
Oven temperature and hardness (two columns)
24 curing runs at oven temperatures between 160 and 200 °C with the measured hardness. Shows the pairwise correlation of two columns: Pearson r = 0.82 (p < 0.001) with a scatter plot.
Project template Module: Correlation Analysis
Paint defects per m² on two lines (2 Poisson rates)
54 paint defects on 120 m² (line 1) versus 24 defects on 95 m² (line 2). The area is the exposure; defects per m² are compared. Invented scenario.
Project template Module: Attribute Tests
Paper Helicopter — Root Cause Analysis (Ishikawa 6M)
6M fishbone diagram for flight-time variation: throwing technique, clip fit, paper, folding precision, drafts and stopwatch reaction time as candidate causes — throwing technique confirmed as the main driver.
Project template Module: Ishikawa 6M
Pizza Delivery Time (correlation matrix)
Same 30 pizza deliveries as the regression dataset — here as a correlation matrix over distance, traffic level and delivery time. Highlights the strong pairwise Pearson correlations.
Project template Module: Correlation Analysis
Processing time old vs. new (rank path, Mann-Whitney)
12 right-skewed processing times (min) each for the old and the new procedure; normality is rejected for both samples. Goal: with small non-normal samples the module picks the Mann-Whitney U test (p ≈ 0.02).
Project template Module: Hypothesis Test
Project selection criteria
Pre-filled criteria for project selection in the pizza-delivery process: delivery time, pizza quality, price, employee satisfaction, complaint rate. Pairwise comparisons are run inside the module.
Project template Module: Pairwise Comparison
Project selection criteria, completed
Five project-selection criteria for the pizza-delivery process, all ten pairs decided (one tie). The ranking is shown on the “Result” tab. Learning goal: read the scores and ranking from the win/loss matrix.
Project template Module: Pairwise Comparison
Scrap before and after the improvement (2 proportions)
46 of 1200 parts scrapped before, 21 of 1150 after a process change. Invented scenario.
Project template Module: Attribute Tests
Setup time before/after (paired)
Setup times (min) on 12 machines before and after a SMED workshop. Paired bootstrap of the mean saving and a one-sided sign-flip permutation test (exact, 2¹² assignments).
Project template Module: Resampling
Supplier change: equivalent defect rate? (equivalence test)
46 of 1200 parts failed with the old supplier, 41 of 1180 with the new one, bound ±1 percentage point. The 90 % interval of the difference does not lie entirely within the bounds – equivalence is not shown. Invented scenario.
Project template Module: Attribute Tests
The same parts before and after (McNemar)
150 parts are inspected before and after a rework (pass/fail). Paired data: only the parts whose result changed count. Invented scenario.
Project template Module: Attribute Tests
Vacation request (classic approval flow)
9 steps across 4 roles, paper-based workflow from application to system booking. Processing ≈ 22 min, Lead Time > 4 workdays — PCE < 1 %. Classic office lever: one huge idle block in the manager's inbox.
Project template Module: Makigami Matrix
Waiting time of two branches (large samples)
40 right-skewed waiting times (min) each from two branches; normality is rejected, but n ≥ 20 per group. Goal: the module keeps the Welch t-test (p ≈ 0.054) and shows the Mann-Whitney test (p ≈ 0.07) as a secondary result.
Project template Module: Hypothesis Test

Improve

Bacterial Growth (exponential model)
30 germ counts over 15 hours, the count grows by about 25 % per hour. The exponential model y = a·e^(bx) captures the curved trend where a straight line misses systematically.
Project template Module: Regression Analysis
Batch Complaints (NegBin GLM)
30 batches with batch size and supplier as predictors, complaints as response. Overdispersed count data — negative binomial regression additionally estimates the dispersion parameter θ.
Project template Module: Regression (Attributive)
D-optimal augment: on existing data set
Three continuous factors, quadratic model, 12 runs total — six already measured. The example creates a data sheet with the existing measurements and augments it with six additional D-optimal runs.
Project template Module: DoE Planner
D-optimal mixed: 3 cont. + 1 categorical
Three continuous factors plus one three-level categorical factor (material). Mixed-level optimal designs are a textbook D-optimal use case — classic schemes cannot handle this.
Project template Module: DoE Planner
D-optimal RSM: 3 factors, quadratic
Response-surface model with three continuous factors and a full quadratic polynomial in 12 runs. Classic D-optimal use case.
Project template Module: DoE Planner
D-optimal screening: 5 factors, linear + 2FI
Five continuous factors with main effects and two-factor interactions in 18 runs. D-optimal alternative to Plackett-Burman when 2FI must stay in the model.
Project template Module: DoE Planner
Defects per Shift (Poisson GLM)
40 shifts with feed rate (mm/s) and tool wear (h) as predictors, defect counts as response. Poisson model with log(λ) = -1 + 0.02·feed + 0.03·wear.
Project template Module: Regression (Attributive)
Fuel Consumption with Outliers
30 vehicle measurements speed → fuel consumption. Two deliberate outliers (rows 6 and 23) drop R² compared to the clean linear fit. Textbook case for residual diagnostics and outlier detection.
Project template Module: Regression Analysis
Learning Curve (logarithmic model)
30 repetitions of an assembly task with output per hour. Performance rises quickly at first and levels off later. The logarithmic model y = a + b·ln(x) describes this saturation.
Project template Module: Regression Analysis
Morphological Box: Pizza Delivery
Four parameters (vehicle, heat retention, order intake, delivery area) with three options each, three incompatible pairs and three concepts — one of them with a conflict.
Project template Module: Morphological Box
Motor Trials (multicollinearity)
30 motor trials with rpm and torque as predictors, power as response. Torque ≈ 0.04·rpm — predictors are highly collinear, VIF spikes. Textbook multicollinearity case.
Project template Module: Regression Analysis
Paper Helicopter — DoE (Rotor Length × Paperclips)
3² full factorial with 2 replicates (18 runs), blocked by rotor length (L = 8 → 6 → 4 cm, physically forced). Paperclip order randomized within block. True optimum at (L ≈ 7 cm, C = 1) lies between tested lengths — a textbook RSM case.
Project template Module: DoE Planner
Paper Helicopter — Response Optimization
Goal: optimize the regression model from the DoE Planner "Paper Helicopter" example (18 runs) for "maximize flight time". Predicted optimum at (L ≈ 7 cm, C = 1) → t̂ ≈ 2.80 s, lower desirability bound 2.5 s — lies between the physically tested rotor lengths (6 and 8 cm) and demonstrates the core RSM advantage. This example only loads an empty optimizer state, since response-optimization sources models project-globally from the Regression module. Workflow: open the doe-planner example → action "Transfer to Regression" → "save as model" there → response-optimization then comes alive with data.
Project template Module: Response Optimization
Pipe Pressure Drop (power model)
30 measurements of pressure drop at rising flow, Δp grows roughly with v^1.8. The power model y = a·x^b returns the exponent directly as a coefficient.
Project template Module: Regression Analysis
Pizza Delivery Time — Optimum
The saved regression model of the pizza delivery time (distance, traffic level; adjusted R² ≈ 0.91) is already in the project, and the delivery time is to be minimised. The example shows the computed optimum with desirability, predicted delivery time and the factor settings at the optimum — for this linear model it lies in the corner with the shortest distance and the lowest traffic.
Project template Module: Response Optimization
Pizza Delivery Time (multiple linear regression)
30 pizza deliveries with distance (km), traffic level (1–5) and measured delivery time (min). Linear model Time ≈ 5 + 2.5·distance + 1.2·traffic — textbook dataset for multiple linear regression with high R².
Project template Module: Regression Analysis
Solder Inspection (logistic GLM)
50 PCBs with solder temperature (220–255 °C) and pressure (2.0–3.5 bar) as predictors, defect (0/1) as response. Textbook case for binary logistic regression without a trials column.
Project template Module: Regression (Attributive)
Surface Defects (Poisson GLM)
30 production lines with speed (parts/min) and line age (years) as predictors, surface defect counts as response. Poisson model for predicting the expected defect rate.
Project template Module: Regression (Attributive)
TRIZ 9 Windows Pizza Delivery
3×3 matrix Sub-/System/Super-system × Past/Present/Future — applied to the pizza delivery process.
Project template Module: 9 Windows (TRIZ System Operator)
TRIZ Contradiction: Speed vs. Productivity
Classic TRIZ contradiction from the pizza case: deliver faster without sacrificing productivity. Improving = 9 (Speed), worsening = 39 (Productivity).
Project template Module: Contradiction Matrix (TRIZ)
TRIZ Evolution Trends: Passenger-Car Headlight
Eight classical evolution trajectories applied to a passenger-car headlight — from twin-headlight to adaptive LED matrix and beyond.
Project template Module: Trends of Technical Evolution (TRIZ)
TRIZ function analysis: toothbrush
Function model of a manual toothbrush with plaque as target: an insufficient cleaning function, excessive brushing pressure and two harmful effects on the gums.
Project template Module: Function Analysis (TRIZ)
TRIZ IFR: Belt Conveyor
Three IFR levels for a jamming belt-conveyor transfer chute, with an obstacle list as the task backlog.
Project template Module: Ideal Final Result (TRIZ)
TRIZ Physical Contradiction: Aircraft Wing
Classic textbook case: a wing must be both long (lift) and short (drag). Resolved via separation in time — swing wing.
Project template Module: Physical Contradiction (TRIZ)
TRIZ Resources Checklist: Belt Conveyor
Resources inventory across 6 categories × 3 system levels for the belt-conveyor case — companion to the IFR example.
Project template Module: Resources Checklist (TRIZ)
TRIZ Substance-Field: Drill / Concrete
Su-Field model for an insufficient mechanical action (drill on concrete). Diagnosis: class 2 — pulsed mode (hammer drilling) selected.
Project template Module: Substance-Field Analysis (TRIZ)
Yield from a Designed Experiment (DoE term preset)
Full-factorial 2² experiment with temperature and pressure, replicated three times, yield as response. The term preset from the experiment planner (main effects and interaction) is applied on the first run; aliased terms would trigger a note.
Project template Module: Regression Analysis
Yield Trials (logistic GLM)
Eight temperature levels with 50 trials each. Binomial response (successes / trials) follows a logistic curve with inflection around 160 °C. Textbook case for binomial GLM with a trials column.
Project template Module: Regression (Attributive)

Control

Box-Cox I-MR chart: lognormal lifetimes
50 lognormally distributed lifetimes. A plain I-MR chart raises false alarms because of the right skew. After Box-Cox transformation (λ ≈ 0) the residuals become approximately normal.
Project template Module: Control Chart (Box-Cox transformed)
c-Chart: defects per unit
30 inspection units of constant size. Mean defects ≈ 3, units 22–23 spike to ~8 — c-chart triggers.
Project template Module: Control Chart (Attribute)
CUSUM chart: small drift
The same 60 observations as in the EWMA example: 30 points at μ=10, then a shift to μ=10.1. The CUSUM chart (k=0.5σ, h=4σ; baseline: first 30 points) accumulates the small deviations and signals from point 37, although no single value leaves the Shewhart limits.
Project template Module: Control Chart (Time-Weighted)
EWMA chart: small drift
60 observations: mean stays at μ=10 for the first 30 points, then shifts to μ=10.1 (≈ 1σ). EWMA with λ=0.2 detects the drift; a Shewhart I-chart misses it.
Project template Module: Control Chart (Time-Weighted)
Hotelling T²: bivariate correlation
40 bivariate observations with ρ ≈ 0.85. Observations 30 and 31 are multivariate outliers — plausible on each margin but joint deviates from the correlation ellipse.
Project template Module: Multivariate Control Chart (Hotelling T²)
I-MR Chart with Annotation and Frozen Limits
The same 50 individual measurements as in the I-MR chart with shift; measurement 14 (10.1725) is annotated as a tool change and excluded from the limit calculation, and the limits from the first 29 values are frozen for Phase II (rule 1). Shows that frozen limits judge the later values: nine values from measurement 30 on lie above the upper control limit, without the exclusion there would be eight.
Project template Module: Control Chart
I-MR Chart with Drift
50 individual measurements with a linear upward drift (+0.6 across the series). Nelson rule 3 (six points in a row trending up) should fire multiple times.
Project template Module: Control Chart
I-MR Chart with Shift
50 individual measurements with a step shift from μ = 10.00 to μ = 10.18 at observation 30. The Nelson rules (especially rule 1 and rule 5) should flag the shift.
Project template Module: Control Chart
Lessons Learned Pizza Pilot
4 lessons from the pilot: pre-route planning (success), double-wall thermal boxes (success), Monday standup (improvement), order intake bottleneck (problem).
Project template Module: Lessons Learned
np-Chart: constant sample size
30 lots of 100 inspected parts each with about 4 % defectives; in lots 24–26 the rate rises up to 16 %. The np chart plots the number of defectives directly and flags lots 24 and 25 above the upper limit.
Project template Module: Control Chart (Attribute)
p-Chart: variable sample sizes
30 inspection lots with variable sample size (80–120) and varying defect rate. Lots 18–20 at ~10 % — the p-chart should flag them as out-of-control.
Project template Module: Control Chart (Attribute)
Paper Helicopter — Confirmation (I-MR Chart)
I-MR chart from 5 confirmation runs at the optimum (L = 6 cm, C = 1 clip, mean ≈ 2.76 s, σ ≈ 0.12 s). Control limits derived from the baseline spread — the process is in control at the optimum.
Project template Module: Control Chart
Paper Helicopter — Lessons Learned
5 lessons from the project: sequential blocking resolves the irreversibility of the rotor length (success), MSA before DoE (success), focusing on two factors (success), plus wing width not viable as a third factor (problem) and throwing technique dominating the residual variation (problem).
Project template Module: Lessons Learned
Shaft Diameter (X̄-R, in control)
25 subgroups of 5 measurements each from a stable process (μ = 10.00 mm, σ = 0.05 mm). X̄-R chart shows no Nelson-rule violations.
Project template Module: Control Chart
Shaft Diameter (X̄-S, in control)
The same 25 subgroups of 5 measurements as in the X̄-R example, but with the standard deviation s instead of the range R as dispersion chart; no Nelson rule fires. Shows that both chart types give almost identical limits for a stable process.
Project template Module: Control Chart
Shaft Diameter with Specification Limits
Stable X̄-R chart of the shaft diameters with specification limits LSL = 9.75 mm and USL = 10.25 mm; process capability comes out at Cp ≈ 1.61 and Cpk ≈ 1.56. Shows that Cpk is smaller than Cp because the mean (9.991 mm) lies slightly below the center.
Project template Module: Control Chart
Short-Run Z-MR chart
Three short setups with different means (10, 25, 7.5), 8 measurements each. After nominal centering they form one comparable process (σ ≈ 0.05).
Project template Module: Control Chart (Short-Run Z-MR)
t-Chart: days between rare events
25 intervals from Exponential(μ=35 days). At observations 16–18 the rate doubles (μ=12) — t-chart shows a visible shift.
Project template Module: Control Chart (Rare Events)
u-Chart: defects per unit with varying sample size
30 samples of 5–15 inspected units with about 2 defects per unit on average; in samples 21–23 the defect rate doubles. The u chart converts to defects per unit, draws limits that vary with the sample size and flags exactly these three samples.
Project template Module: Control Chart (Attribute)

Data & Tools

Bolt diameter (data collection)
Bolt diameter measurement series with a few embedded outliers.
Project template Module: Data Collection
Box-Cox transformation: lognormal cycle times
80 strongly right-skewed lognormal cycle times. Box-Cox (optimal λ ≈ 0) makes the values approximately normal.
Project template Module: Data Transformation
Complaint Cost Q2 (Pareto)
50 Q2 complaints with reason and individual cost. The Pareto analysis sums cost per reason and sorts descending — the 80 % line shows that 'dimensional deviation' alone accounts for most of the cost, even though it is not the most frequent reason. Textbook example: frequency ≠ importance.
Project template Module: Pareto Chart
Complaint reasons Q1 (donut)
248 customer complaints from Q1, split across six reasons. Donut variant (innerRadius = 0.5) with the total shown as the center label — useful when the total itself carries a key message.
Project template Module: Pie Chart
Cycle Time Shift × Line (heatmap)
45 cycle-time measurements (in seconds) across three shifts (early/late/night) and three production lines (L1/L2/L3) — 5 readings per combination. The heatmap reveals two effects at once: a line effect (L3 ≈ 30 s slower than L1) and a shift effect (night ≈ 10 s slower than early). The (night, L3) cell at 82 s is the clear worst case — a perfect starting point for the Analyze phase.
Project template Module: Heatmap
Defects per Shift (bar chart)
60 defect events across three shifts (Early/Late/Night) and four defect types (scratches, dimensional, surface, other). The stacked bar chart shows at a glance that the early shift is dominated by dimensional defects while the night shift produces mostly surface defects — a classic anomaly for the Measure phase.
Project template Module: Bar Chart
Delivery time by driver (boxplot)
Three boxes showing delivery-time distributions for drivers A/B/C. Same data as the ANOVA example — the boxplot visualizes the ANOVA effect.
Project template Module: Boxplot
Delivery time by driver (individual value plot)
Three point clouds of delivery time for drivers A/B/C with connected means — same data as the ANOVA and boxplot examples.
Project template Module: Individual Value Plot
Delivery time per driver (data collection)
Raw delivery-time data, grouped by driver.
Project template Module: Data Collection
Engine trials (data collection)
Raw engine-trial data with several collinear predictors.
Project template Module: Data Collection
Fuel consumption (data collection)
Raw fuel-consumption data with a few embedded outliers.
Project template Module: Data Collection
Fuel Consumption with Outliers (scatter plot)
Same 30 vehicle measurements as the regression dataset — scatter plot of fuel consumption over speed with stats panel. Two deliberate outliers (rows 6 and 23) are directly visible in the plot.
Project template Module: XY Plot
Inspection Log (all column types)
15-row inspection log that exercises all seven worksheet column types: text (inspection ID, shift), date, time, numeric (diameter in mm), currency (unit cost €), percent (scrap rate) and binary (OK 0/1). Includes a few null cells on purpose to show how missing values are handled.
Project template Module: Data Collection
Machine Fleet (bubble chart)
10 machines with cycle time, scrap rate and daily output. The bubble chart prioritises Six Sigma improvement projects: large bubbles in the upper right (high scrap at high output) are the most expensive problem cases.
Project template Module: Chart Suggestion
Motor Trials (multicollinearity)
Same 30 motor trials as the regression dataset — two scatter plots of power over rpm and power over torque, with stats panel. Visualises the strong predictor correlation before fitting a regression.
Project template Module: XY Plot
Orders with Formula Columns
10 order rows with quantity, unit price (€), calculated total (=qty·price), discount (%) and final price (=total·(1-discount)). Demonstrates cell-reference formulas and currency/percent columns.
Project template Module: Data Collection
Paper Helicopter — Baseline (Individual Value Plot)
10 baseline runs at (L = 8 cm, C = 0 clips) as an individual value plot — shows the mean and spread of flight time before the DoE.
Project template Module: Individual Value Plot
Paper Helicopter — Clips vs. Flight Time (XY Plot)
Scatter plot of the 18 DoE runs (clips vs. flight time) — shows a visibly non-linear relationship across all three rotor lengths, motivating the quadratic clip term in the DoE.
Project template Module: XY Plot
Paper helicopter — flight times (data collection)
Raw data of the trade-fair project in three sheets: baseline (L = 8 cm, C = 0), 3² full factorial with 2 replicates (18 runs) and confirmation runs (L = 6 cm, C = 1).
Project template Module: Data Collection
Paper helicopter — stopwatch MSA (data collection)
Raw MSA type 1 data: repeated stopwatch readings against a 2.000 s metronome reference.
Project template Module: Data Collection
Pizza deliveries (data collection)
Raw pizza delivery data: delivery time, distance, number of pizzas, driver.
Project template Module: Data Collection
Pizza Delivery Time (scatter plot)
Same 30 pizza deliveries as the regression dataset — scatter plot of delivery time over distance with stats panel. Useful for visual exploration before fitting a regression.
Project template Module: XY Plot
Production Line Defects (bubble chart)
10 production lines with defect rate, repair cost per defect, and monthly defect count. The bubble chart shows the classic frequency ↔ unit-cost trade-off; bubble size reveals which lines carry the largest absolute loss potential — an ideal entry point for DMAIC project selection.
Project template Module: XY Plot
Production Q1–Q3 (multi-sheet demo)
Three sheets (Q1/Q2/Q3) with production data of 10 batches each. Demonstrates the multi-sheet feature of the worksheet — switch via tabs at the bottom.
Project template Module: Data Collection
Project Portfolio (bubble chart)
12 Six Sigma project candidates with effort (person-days), annual benefit (k€) and risk score, grouped by area (Production vs. Quality). The bubble chart prioritises project selection while showing how the two areas position themselves in the effort/benefit/risk landscape: small bubbles in the upper left are quick wins; large bubbles in the lower right should be deferred.
Project template Module: XY Plot
Q-Q plot: comparing two shifts
Two shifts of 40 measurements each — shift A ≈ N(μ=9.5, σ=1.5), shift B ≈ N(μ=10.8, σ=2.2). The probability plot shows two lines with different location and slope.
Project template Module: Probability Plot
Q-Q plot: measurement resolution problem
80 bolt diameters measured with a gauge that is too coarse (resolution 0.1 mm versus process σ ≈ 0.15 mm). The probability plot shows clearly visible vertical stripes — a classic indicator of insufficient measurement resolution.
Project template Module: Probability Plot
Q-Q plot: Weibull lifetimes
80 Weibull(k=2.5) lifetimes on the normal probability plot — visible curvature in the tails.
Project template Module: Probability Plot
Run-Chart with shift
I-MR series: observations 1–29 stable at μ=10, from obs. 30 shift to μ=10.18. Western Electric / Nelson rules flag the shift.
Project template Module: Run Chart
Scrap by defect type
395 scrap parts from a production line, split across six mutually exclusive defect types. Textbook pie-chart use case: share of a few categories of a whole. Full-circle variant (innerRadius = 0).
Project template Module: Pie Chart
Setup time before/after (data collection)
Setup times on 12 machines before and after a SMED workshop.
Project template Module: Data Collection
Supplier Approval per Plant (mosaic)
60 approval decisions across three plants and three status levels (OK/conditional/rejected). The mosaic plot reveals two effects at once: the volume differences (column widths — plant A has twice as many decisions as plant B, three times more than plant C) and the quality differences (segment heights — plant C has clearly more rejections per plant).
Project template Module: Mosaic Plot
Supplier Scorecard (bubble chart)
12 suppliers with price index, on-time delivery rate and annual order volume. The bubble chart visualises the classic price ↔ reliability trade-off; bubble size reveals which suppliers carry the largest strategic weight.
Project template Module: Chart Suggestion
Yield Optimum (response surface)
Quadratic model for yield = f(temperature, pressure) with optimum at 180 °C and 3 bar. Shows a classic contour map with a pronounced maximum.
Project template Module: Contour Plot

More